Christchurch’s cycle counters logged a record 4.08 million counts across 31 sites in 2024. TomTom’s traffic index also puts the city top of its six New Zealand cities for congestion in 2025, at 45.6%, with drivers losing 89 hours to rush-hour traffic over the year. But does one have anything to do with the other?

We couldn’t find a published study measuring what Christchurch’s cycleways have done to car traffic or congestion. The council says getting more people cycling is key to reducing congestion, and ten of its 13 planned major cycleways are open. Star News put the full programme at an estimated $380m to $450m in January.

What the local numbers show

Bikes are a small slice of the commute. Stats NZ’s 2023 Census shows 5.4% of employed Christchurch residents usually biked to work, second only to Nelson among territorial authorities. About 72% drove themselves and 11.7% worked from home.

Those 4.08 million counts average about 11,100 a day across every site. Star News reports Moorhouse Ave alone carries 52,646 vehicles on an average weekday, though the council says its counters only sample the city’s cycle trips.

The closest thing to a local test of car replacement is old. In an early council survey, reported by the Cycling in Christchurch blog, 15% of 625 riders on the first three routes said they’d have made that trip by car before the cycleway, while 43% would have biked another route. The council’s summary of a 2020 repeat gives no figure for car trips replaced.

The council’s Life in Christchurch transport survey, an opt-in poll of 4,710 people in late 2024, shows the pressure on drivers. Only 51% of car users were satisfied with their journeys, the lowest of any mode, against 72% of people on bikes. Of the 32% who’d passed up or missed a trip, 56% blamed busy traffic and 39% blamed parking.

The survey doesn’t measure how much cycleways contribute, and TomTom’s index doesn’t separate them out either.

What studies elsewhere found

NZTA’s Research Report 724, published in September 2025, reviewed 30 case studies of road space moved from general traffic to uses such as cycle lanes, bus lanes and footpaths. It couldn’t clearly establish the effect on total vehicle kilometres, largely for lack of evidence. It found some evidence of lower congestion, but authors led by Glen Koorey of Christchurch consultancy ViaStrada caution that not all of it fits New Zealand.

London offers a controlled test. A 2021 Imperial College study led by Prajamitra Bhuyan estimated cycle superhighways cut traffic flow by about 6% to 9%, with no statistically significant change in speed.

Closer to home, researchers led by Jamie Hosking reported in 2023 that the Te Ara Mua Future Streets project in Māngere lowered traffic volumes by 17% to 24% on local streets, with no change on collector or arterial roads. That project also reshaped streets to slow traffic, so it isn’t a pure cycleway test.

Ralph Chapman and colleagues put the benefit-cost ratio of a walking and cycling programme in Hastings and New Plymouth at about 11 to 1, mainly from health gains. The estimated saving in vehicle kilometres was 1.21%, because they assumed the car trips replaced were short.

Business access and who pays

We couldn’t find a before-and-after study of Christchurch retailers’ takings either. A 2020 council report on Colombo St says some early options lost 60% to 74% of existing parking, a key concern for business owners between Salisbury and Kilmore streets. A review of 23 mainly North American studies by Jamey Volker and Susan Handy found generally positive or non-significant effects on nearby retail and food businesses, with possible harm to car-centred ones.

Business Canterbury’s March annual plan submission doesn’t mention cycleways, but calls rates a fixed cost businesses can’t easily mitigate or pass on. Mayor Phil Mauger told RNZ in July 2025 that he isn’t against cycleways, but “we can build them one hell of a lot cheaper”.

Chris Lynch Media reported that Linwood councillor Yani Johanson voted against an Antigua St cycleway in 2022, saying roads in the east with long-deferred renewals should come first. When a block of Antigua St reached about $5m in 2025, Harewood councillor Aaron Keown said people were annoyed by the spending. Spreydon councillor Melanie Coker accused Mauger of a lack of leadership for opposing it.

Mauger’s March Letter of Expectations told staff to plan for rates rises of no more than 6%, 5% and 4% over the first three years of the 2027-37 Long Term Plan. The Local Government (Rates Capping) Amendment Bill, which proposes a 2% to 4% band from 1 July 2029, passed its first reading on 1 September and isn’t law.

Transport Minister Chris Bishop’s 13 August statement says National Land Transport Fund revenue from 2027/28 is likely to cover only continuous programmes, critical resilience work, debt repayments and projects underway. NZTA’s national walking and cycling budget for 2026/27 is $81m, with $83m committed, and 2027/28 isn’t confirmed.

Next up is an open council meeting on 8 December, when councillors are due to give formal guidance on the plan. Public consultation is pencilled in from 18 February to 24 March 2027.